Skip to content
byloken dev
SveinContactSign in

Assemble a wind turbine in mixed reality

PR-2024-02
Energy — offshore wind
Apr 2024 – Sept 2024

01 Challenge

The client wanted to show how the main parts of an offshore wind turbine fit together, in an experience visitors could try for themselves.

02 Solution

Working with a designer, I developed a headset application with hand tracking, step-by-step assembly and visual explanations.

03 Result

The experience was used at Floating Wind Days and ONS 2024, letting visitors explore the assembly through interaction.

Sector
Energy — offshore wind
Period
Apr 2024 – Sept 2024
Role
3D/XR developer
  • Unreal Engine
  • C++
  • Meta Quest
  • Mixed reality
  • Figma
  • UX design

Gallery